TAOS Enclosure
Prototype Design
Prototype in Assembling
Prototype Testing in National Central University
New Design
The First Enclosure at Nan-Jou Precision
Enclosure #1 is tested at the Institute of Earth Science, Academia Sinica
Enclosure #2 installed at Lulin
(site A) (12~14 Jan., 2000)
Enclosure #1 is installed at Lulin
(site B) (21~23 Jan., 2002)
Enclosure C tested at Lulin
(Oct. 2002)
Enclosure C finished
(more test pictures are
here
) (Feb. 2003)
Enclosure D installed at Lulin
(Jan. 2004)
Retrofit of TAOS C lid
(May-Sep 2004)
Retrofit of TAOS A/B lids
(Nov. 2004)
(picture taken by S. K. King, Dec. 2004)
Last Updated by S. K. King (24 Dec., 2004)
Home page of TAOS